
Heavy-Duty Tunnel Mining LED Strip
- Voltage AC36V/48V/AC110V/AC220V
- Color RGB / White
- Waterproof IP68
The PILEDS Mine LED Light Strip is an AC-mains, IP68-sealed strip light built for mining shafts, tunnels and civil-defense works. Running directly on AC36V–AC220V and strap-mounted to walls and arches, it delivers rugged, impact-resistant task lighting for confined and hazardous spaces — in white or RGB, cut to length on site.

Real factory models — pick one, or tell us your spec and we'll match the SKU.





Use these decisions to narrow the model range before controller, power, cabling, and mounting quantities are engineered.
AC36V / 48V / 110V / 220V by model
Match the ordered strip and connectors to the engineered site supply. Do not substitute voltages in the field, and confirm local electrical requirements before installation.
IP68 strip with watertight connectors and end caps
The completed run is only as protected as its cuts, joints, feed cable, and end termination. Specify factory lengths where possible and document the field re-sealing method.
0.5–50 m options; strap-mounted flexible body
Provide each run length, bend path, fixing interval, feed location, and replacement access. The available length and wattage vary by model.
IP rating and project-specific certificates
IP68 addresses ingress protection only. For a classified hazardous location, approve the exact model against the required explosion-protection certificate and marking before purchase.
No. IP68 describes dust and water ingress protection; it does not certify explosion protection. For a classified hazardous area, request the exact model's certificate, marking, issuing body, and scope, then have the project authority approve it before ordering.
Use the voltage defined by the engineered site supply and local requirements. Available products include AC36V, 48V, 110V, and 220V configurations, but the strip, connectors, protection devices, cable, and feed layout must be specified as one system.
Model-specific lengths can be cut or supplied to length, but every field cut changes the sealing boundary. Use the approved connector, end cap, and re-sealing procedure, and verify the completed assembly before energizing it.
Provide site voltage, individual run lengths, total metres, wattage or illuminance target, mounting path, ambient conditions, connector locations, required ingress and hazardous-area certificates, cable entry method, project country, and spare quantity.
Get a sample within 7 days — talk to a Pileds engineer about channels, optics, IP-rating, and finish for your venue. We reply within one business day.