Power planning

LED Power Injection Planning Tool

Sketch proposed feed positions along a strip for review with your project engineer.

Project inputs

Map proposed power feed positions

Enter an interval already selected for review. The first feed is at 0 m; later points are placed at that interval before the end of the run.

Planning result

Your estimate

Enter your project inputs to calculate a plan.

Positions are a planning sketch, not a safe or recommended interval. This tool does not calculate voltage drop, strip copper limits, conductor size, fusing, inrush, feed currents or supply isolation. Never parallel supply positive outputs without manufacturer approval; have the full design checked.

Estimate cable voltage drop →

How to map proposed power feed locations

Enter the strip run length and a feed interval you have chosen for discussion. The tool places a first feed at 0 m and lists additional positions at that interval strictly before the run end. It does not calculate or recommend the interval.

For an 11 m run with a user-entered 5 m interval, the displayed positions are 0 m, 5 m and 10 m. For a 10 m run at that interval, the output is 0 m and 5 m: the far end is not automatically added. Add any end feed only as part of the actual engineering plan.

Why feed interval depends on the installation

The correct distribution layout depends on the selected strip’s rated voltage and power, internal conductor limits, actual feed paths, connectors, cable resistance, fusing and permitted voltage at the load. Different loads and connection arrangements do not share a universal safe interval.

The positions here do not calculate voltage drop, feed current, protection, inrush or supply isolation. An engineer should use the real product datasheet and installation conditions to determine the number and locations of feeds and verify the complete circuit.

Coordinate feeds, supplies and protection

Identify the load and supply assigned to each segment, cable lengths and sizes, connection hardware and individual protection requirements. Follow the supply and strip manufacturers’ instructions; do not parallel positive outputs of separate supplies unless explicitly allowed by their manufacturers.

Use the supply calculator for a preliminary power rating and the voltage-drop tool for a feeder screening estimate. Neither replaces verification of strip copper limits, connectors, protection or applicable installation requirements.

Frequently asked questions

Does this tool tell me the safe distance between power injections?
No. The interval is entered by the user and the output is a layout sketch only. Safe spacing must be calculated and verified for the actual products and installation.
Does the tool automatically add a feed at the far end?
No. It lists the start and subsequent user-specified intervals strictly before the end of the run. End feeds and other arrangements must be designed separately.

Continue planning your project

Reference: ENTTEC: LED pixel power calculator. Confirm design assumptions with current equipment documentation.